Leaving Cert Geography · Rivers — Fluvial Processes and LandformsHuman interaction: river processes

19 sections · 12 key terms · Syllabus 1.7

Why people interfere with rivers

Human activity changes how river processes operate: velocity, erosion, transport, deposition and flooding.

  • Reasons include electricity, water supply, irrigation, navigation, draining farmland and protecting towns from flooding.

How a hydro-electric dam works

  • The dam stores water in a reservoir, and water falls through turbines.
  • The drop in height (head) gives the power.

Hydro-electric dams: impacts upstream

  • Velocity falls to near zero in the reservoir, so the river deposits its load there.
  • The reservoir slowly fills with sediment (sedimentation), reducing its capacity.
  • A delta can build where the river enters the reservoir.

Hydro-electric dams: impacts downstream and on flow

  • Water released from the dam is clear of sediment, so it has spare energy and erodes the bed and banks below the dam (clear-water erosion).
  • The floodplain and delta receive no new silt, so deltas and coasts erode.
  • Discharge is regulated, so natural floods and low flows are evened out.
  • Less flooding means less deposition on the floodplain.
  • Where water is diverted out of the old channel, the bypassed channel carries much less water.
  • Dams block migrating salmon and eels; fish passes and trapping and transporting fish around dams are responses.

Shannon Scheme at Ardnacrusha

The Shannon Scheme is one power station at Ardnacrusha, near Limerick, fed by a weir and a canal. It is not a series of dams.

  • Built 1925–1929 by the German firm Siemens for the Irish Free State.
  • Parteen Weir diverts most of the Shannon's water into a headrace canal to Ardnacrusha; a tailrace returns it to the river near Limerick.
  • Lough Derg's level is controlled by Parteen Weir, so the lough acts as the scheme's reservoir.
  • The original channel between Parteen and Limerick, the Old River Shannon, carries much less water.
  • Salmon and eel stocks declined; the ESB built a fish pass and traps silver eels upstream and transports them past the dam.
  • It was Ireland's first large hydro-electric station.

Other Irish hydro-electric dams

  • Poulaphouca dam, River Liffey: created the Blessington Lakes reservoir, Co. Wicklow; it generates electricity and supplies drinking water to Dublin.
  • Inniscarra and Carrigadrohid dams, River Lee, Co. Cork.
  • Cathaleen's Fall power station, River Erne, at Ballyshannon, Co. Donegal.

Aswan High Dam: reservoir and benefits

  • Aswan High Dam, River Nile, Egypt, completed 1970; its reservoir is Lake Nasser, which extends into Sudan.
  • Benefits: flood control, year-round irrigation allowing more than one crop a year, hydro-electricity, and protection from drought.

Aswan High Dam: impacts on river processes and people

  • Silt is trapped in Lake Nasser, so farmers downstream rely on artificial fertilisers.
  • The river bed below the dam is scoured by clear water.
  • The Nile delta coast is eroding, e.g. at the Rosetta promontory.
  • The sardine fishery off the delta in the Mediterranean declined sharply.
  • Waterlogging and salinisation of irrigated land.
  • Perennial irrigation canals spread the disease schistosomiasis (bilharzia).
  • Nubian people were displaced, and the temples of Abu Simbel were moved to higher ground.

Three Gorges Dam, Yangtze River

  • Three Gorges Dam, Hubei province, China: the world's largest power station by installed capacity.
  • Completed in 2006 and fully operational in 2012; over one million people were relocated.
  • It aims to reduce flood peaks downstream; the Yangtze floods of 1998 killed thousands.
  • It traps sediment that once reached the river's lower course and delta.

Canalisation: what it is and its purposes

Canalisation modifies an existing river channel. It is not the same as building a canal.

  • Methods: straightening, deepening and widening the channel; sometimes lining it with concrete; cutting through meanders; dredging; building locks and weirs for navigation.
  • Purposes: navigation, faster drainage of land, and flood control.

Canalisation: impacts on river processes

  • A straighter, shorter course has a steeper gradient and less friction, so velocity rises.
  • Water and floods are passed downstream faster, so flood peaks downstream are higher and arrive sooner.
  • Faster flow erodes the bed and banks.
  • Where the channel widens or the flow slows again, deposition increases and dredging is needed.
  • Meanders, oxbow lakes, pools and riffles are lost, and the river is cut off from its floodplain.

Canalisation: Irish and international examples

  • Arterial drainage by the Office of Public Works (OPW) under the Arterial Drainage Act 1945, e.g. the Moy and Boyne schemes: rivers were deepened and straightened to drain farmland.
  • Arterial drainage effects: changes to fish spawning beds, bank erosion and downstream flooding.
  • Mississippi: cut-offs made by the US Army Corps of Engineers shortened the river.
  • Rhine: the Upper Rhine was straightened in the 19th century under Johann Gottfried Tulla, which sped flood waves downstream and caused the bed to erode downward.
  • Navigation in Ireland: locks and weirs on the Shannon Navigation control water levels and slow the flow.

Causes of flooding

Flood control measures respond to the causes of river flooding.

  • Prolonged or intense rain, and saturated ground.
  • Urban surfaces and drains speed runoff; deforestation and drainage of bogs and farmland upstream add to it.
  • Building on floodplains puts homes in the path of floodwater.

Hard engineering flood control

  • Embankments and levees confine flow to the channel, so deposition raises the bed and the banks must be raised again; the floodplain gets no silt, and failure gives sudden, severe floods.
  • Flood walls and demountable (removable) barriers in towns.
  • Dams and reservoirs store floodwater.
  • Dredging and deepening increase channel capacity, but the flow is faster and downstream flooding can increase.
  • Relief (bypass) channels take floodwater around the town.

Soft engineering flood control

  • Floodplain zoning: planning controls on building.
  • Afforestation upstream: interception slows runoff.
  • Restoring wetlands and bogs, and washlands that are allowed to flood, giving the river more room.
  • Flood forecasting and warning.
  • Effect on processes: natural flooding and floodplain deposition continue.

Irish flood case studies

  • Cork, November 2009: the River Lee flooded when the ESB released large volumes from Inniscarra dam during very heavy rain because the reservoir was full.
  • The releases were not the sole cause; the rain was exceptional. The University College Cork and the city water treatment works were flooded, and many homes lost their water supply.
  • Clonmel, Co. Tipperary: an OPW flood relief scheme on the River Suir uses demountable barriers that are put in place when floods are forecast.
  • December 2015: Storm Desmond caused prolonged flooding on the Shannon, in towns such as Athlone.
  • CFRAM (Catchment Flood Risk Assessment and Management) is the OPW programme that maps flood risk.

Mississippi levee system

  • The Great Mississippi Flood of 1927 led to the US federal levee and floodway system run by the US Army Corps of Engineers.
  • The 1993 flood breached many levees along the upper Mississippi and Missouri.
  • In August 2005 Hurricane Katrina caused levee and floodwall failures in New Orleans, and about 80% of the city flooded.
  • Levees stop flood silt reaching the delta, which contributes to the loss of Louisiana's coastal wetlands.

Netherlands: Room for the River

  • Room for the River (Ruimte voor de Rivier), Netherlands, started after near-disastrous high water on the Rhine and Maas in 1993 and 1995.
  • Measures include moving dykes back, lowering floodplains and digging side channels so the river can spread out safely.

Evaluation of flood control and dams

  • Benefits: protection of homes, electricity, navigation and water supply.
  • Costs: problems moved downstream, sediment starvation, habitat loss, high cost, and a false sense of security.
  • There is a trend towards working with natural processes.

Key terms

Sedimentation
The slow filling of a reservoir with sediment deposited by the river entering it.
Clear-water erosion
Erosion of the bed and banks below a dam by water that is released free of sediment.
Head
The drop in height of water through a dam, which gives hydro-electric power.
Canalisation
Straightening, deepening or lining an existing river channel, usually for navigation, drainage or flood control.
Arterial drainage
Deepening and straightening rivers to drain farmland, carried out by the OPW under the Arterial Drainage Act 1945.
Levee
An embankment that confines floodwater to the river channel.
Demountable barrier
A removable flood barrier put in place when a flood is forecast.
Relief channel
A bypass channel that takes floodwater around a town.
Floodplain zoning
Planning controls that restrict building on floodplains.
Washlands
Areas of land allowed to flood, giving the river more room.
Interception
The capture of rainfall by vegetation, which slows runoff.
CFRAM
The OPW's Catchment Flood Risk Assessment and Management programme.

Practice questions

  1. Examine the impact of flood control measures on river processes.

    30 marks
  2. Examine the impact of hydro-electric dams on river processes, with reference to examples you have studied.

    30 marks

Model answers, marking and 3 practice questions for this section are in the app. See the answers

Now drill Rivers — Fluvial Processes and Landforms.

Reading is step one. In the app, Rivers — Fluvial Processes and Landforms becomes 129 flashcards and 17 past exam questions marked the way the examiner marks them, with progress saved as you go. Free for Leaving Cert Geography students.